top of page
Key Features
WaterGEMS® with CAD and GIS interface, utilizing existing reduced orthophotogrammetry.
Two foot interval contour data used to automatically assign elevations to pipe junctions.
Model calibration to match actual field conditions during fire flow and C-value testing.
The survey of tank overflow and floor elevations was used to correct SCADA programming and reporting functions.
Water modeling results of system upgrades form the basis for a multiphase Capital Improvements Plan.
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Scott Pickup, Municipal Manager
P.O. Box 370
Bellows Falls, VT 05101
Phone: 802. 463.3964
bottom of page